Re-fill the checkpoint data in a new checkpoint.
Posted: Thu Oct 11, 2012 9:43 pm
Is it possible to use the field data filled in by a checkpoint, so that i can re-fill a other checkpoint later in the flow with that same data. So if i click the "process" button in SwitchClient the data is already filled in.
I know that it is possible with the combination with a Sumbit Point.
I know that it is possible with the combination with a Sumbit Point.