Assemble job after n jobs or a certain time period
Posted: Wed Jan 28, 2015 10:22 am
I have a flow that will receive PDFs over several days. I've set these to assemble into one job before being output to digital (this is currently 4 PDFs). The flow works fine.
What I'm now trying to do is add to the assemble function a time delay ie 4 files OR 180mins after receiving the first file.
The assemble flows to an error folder because Switch preferences are set to abort processing after 60mins.
How can I keep the preferences to 60mins (for all the other flows) but make the assemble function "hang" for 180mins before processing the PDFs?
Hope that makes sense.
What I'm now trying to do is add to the assemble function a time delay ie 4 files OR 180mins after receiving the first file.
The assemble flows to an error folder because Switch preferences are set to abort processing after 60mins.
How can I keep the preferences to 60mins (for all the other flows) but make the assemble function "hang" for 180mins before processing the PDFs?
Hope that makes sense.